Dual Stand

DISTRIBUTOR distributor
COUNTRY FRANCE FRANCE
SOLUTION solution logo
caseattribute time
BUILD TIME 3 HOURS
caseattribute 2people
ASSEMBLY 2 PEOPLE
caseattribute dimension
DIMENSIONS 4M X 2M
caseattribute venue
CATEGORY EXHIBITION

Two clients, one exhibition stand design. A-D-E uses T3 for asset management exhibition.

THE BRIEF

The brief for this project, called for ADE Les Ateliers to create an exhibition stand that would allow two asset management companies to host and discuss their services to the visitors of the exhibition. With limited space and budget for ADE to work with, they came up with a solution that was firstly simple and functional and secondly would help to attract visitors as well as provide a place for interactions and conversations to take place.

OUTCOME

The project consisted of three obvious structures, a fabric back wall, a L shaped fabric counter and another smaller rectangular fabric counter.

Firstly, the two counters were created to serve as spaces for the exhibitors to store literature and other items for their show as well as act as spaces for hosting of conversations with prospective clients. Each was created using the T3 Frame modular display system. In particular, our Fusion profile with Silverlite extrusion was used and allowed for the mounting of the textile graphics with silicon edging.

The large fabric T3 Lightwall provided a back drop for each of the respective exhibitors. The structure was created using the T3 Frame’s Fusion profile coupled with the Silverlite extrusion. The illumination of the fabric graphics was possible by using the T3 Wandlite. This LED tube light couples perfectly with the T3 Frame and was mounted into the framework using the stick light bracket (WLSLB).  The light wall was also fixed with three LED swan lights, which twist and lock into our T3 connectors using our bayonet system.

We had a limited amount of space and budget to work with for this project. Yet T3 allowed us to create this functional and visually pleasing stand for both our clients. The fact that it was able to be built 2 people in a matter of a few hours also made it extremely efficient and cost effective for the clients.

Karene Pleau Director
BROCHURE DONWLOAD

T3 Systems